Lendrum Dual Use Dry Pond

Lendrum Dual Use Dry Pond

Contract Date:
October 31, 2008
Owner:
City of Edmonton
Budget:
$3.5 M
Description:
Large Urban Park site and Open Space Park Facility, Dual Functioning as a SWMF for flash flooding as well as for a school ground track and field / soccer and baseball pitch facility c/w concrete amphitheater and asphalt walkways.